


|
Dosotherm 1200C ready for shipment with the dosing pump shown on the top right hand side of the furnace. The scissor jack can be seen below the furnace The hydraulic scissor jack lifted it to the required height. The yellow mechanical jack then locks it in position. |
|
Dosotherm 1200C during production, minus the scissor jack. The lid of the dosing pump is open, and the pneumatic control panel can be seen on the side of the furnace. The hydraulic pump, for lifting the furnace and the lid can be seen to the right of the pneumatic panel. |
|
Page 1 |
|
Page 2 |
|
Page 3 |
|
Page 4 |
|
Page 5 |